Skip to main content

Design Controls

Design controls are a critical chapter of KGMP (aligned with ISO 13485:2016 Section 7.3) and are particularly scrutinised for Grade III and IV devices.

Key requirementsโ€‹

  • Design and development planning โ€” plan describing stages, responsibilities, and timelines
  • Design inputs โ€” functional, performance, safety, and regulatory requirements documented
  • Design outputs โ€” documented and verified against inputs before release
  • Design review โ€” formal reviews at defined stages with documented results
  • Design verification โ€” confirming design outputs meet inputs
  • Design validation โ€” confirming the finished device meets user needs and intended use
  • Design transfer โ€” ensuring design can be manufactured consistently
  • Design changes โ€” controlled and evaluated for impact before implementation

MFDS inspection focusโ€‹

Inspectors will look for:

  • Traceability from design inputs through to outputs, verification, and validation
  • Evidence that verification and validation were conducted on representative final devices
  • Change control records for any design modifications